Bathroom Remodel Conroe, TX
Bathrooms are one of those spaces that people live with longer than they should. It still works, so they wait. Then one day they're done waiting. When that day comes for Conroe homeowners, we're usually the call. We've been doing full bathroom remodels in Montgomery County since 2002. Every size, every scope.

Quick Answer
Bathroom remodels in Conroe, TX typically run between $8,000 and $45,000 depending on the size of the space and how much you're changing. A hall bath refresh costs a lot less than a primary suite gut. ABM Cabinets handles the full project (demo, tile, vanity, shower, and fixtures) with most bathrooms completed in 2 to 4 weeks.
What a Bathroom Remodel Covers
When we do a bathroom, we do the whole thing. That includes:
- Demo of existing tile, fixtures, and vanity
- Shower and tub installation (walk-in showers, freestanding tubs, combo units)
- Custom vanity installation
- Tile work: floor, shower walls, and accents
- New fixtures: faucets, hardware, mirrors, lighting
- Plumbing rough-in and finish
- Paint and trim
If it's in the bathroom, we handle it.
Walk-In Showers
This is one of the most common requests we get, especially from homeowners updating a primary bath. Removing an old tub-shower combo and replacing it with a walk-in tile shower changes the entire feel of the space. We build custom tile showers with built-in niches, benches, and frameless glass enclosures. We also handle the waterproofing correctly. No shortcuts that cause problems in two years.
Vanity and Storage
A lot of dated bathrooms have small, builder-grade vanities that waste space. We install custom and semi-custom vanities built to fit your exact dimensions, which matters a lot in smaller bathrooms where every inch counts. We also do double vanities for primary baths, floating vanity styles, and full storage tower builds alongside the vanity.
Tile Work
We tile floors, shower walls, accent walls, and niches. We work with all tile types: ceramic, porcelain, natural stone. If you've got a tile in mind, bring us a photo and we'll tell you if it works for the application.
Primary Suite vs. Guest Bath
These are two very different jobs. A primary bath remodel is usually a bigger investment: more square footage, higher-end materials, more custom work. A hall bath or guest bath remodel can be done cleanly for less. We'll scope it accurately so you know what you're getting into before you decide.
The Process
Free in-home estimate
We see the space, talk through what you want, and explain the best options.
Design
Tile, vanity style, shower layout, fixtures, and finishes are selected.
Demo
tile selection, vanity style, shower layout, fixtures
Rough plumbing and waterproofing
We handle the behind-the-wall work and make sure the shower is built to last.
Tile installation
Floors, shower walls, niches, and accent areas are installed with clean detail.
Vanity, fixtures, and finish work
The vanity, faucets, mirrors, lighting, trim, and final details are installed.
Final walkthrough
You walk the finished bathroom with us and review everything before we wrap up.
Most bathroom remodels take 2 to 4 weeks. Larger primary suite projects can run 4 to 6 weeks.
Why ABM Cabinets
We're not a tile-only sub or a plumber who also does tile. We're a remodeling company. That means you get one contract, one project manager, and one crew coordinating all the trades. Conroe homeowners have been trusting us with their bathrooms since 2002. We don't cut corners on waterproofing, substrate prep, or grouting. The stuff that doesn't show but determines whether your remodel lasts.
Free bathroom estimate in Conroe, TX. We come to you and give you a number, not a range.
Questions homeowners ask us.
Most bathroom remodels we do run between $8,000 and $45,000. A simple hall bath refresh is on the lower end. A full primary suite gut with a custom tile shower, freestanding tub, and double vanity is on the higher end. We'll give you a clear scope and number after seeing the space.
Most bathrooms take 2 to 4 weeks. If we're dealing with a large primary suite or significant plumbing changes, expect 4 to 6 weeks. We give you a realistic timeline upfront.
Cosmetic updates (new tile, vanity swap, fixture changes) usually don't need permits. If we're moving plumbing or making structural changes, permits are required. We pull them and handle the inspections.
Yes. This is one of our most common bathroom requests. We demo the existing tub, properly waterproof the area, and build a custom tile shower in its place.
Definitely. Small bathrooms are often the ones that feel most outdated. The scope is smaller, the price is lower, and the transformation is just as noticeable.
Yes. Bring us the tile name, manufacturer, or a sample and we'll source it. If it's not available or not suitable for the application, we'll tell you that upfront.




